East and West Chestermere Drive Upgrade Project
Project Overview
- The purpose of this project is to address current drainage issues along East and West Chestermere Drives and at the same time upgrade portions of these roadways that are failing due to aged, insufficient base structure.
East Chestermere Drive
- The East Chestermere Drive upgrade project is near complete! The final lift of asphalt and remaining landscaping will be concluded this spring as soon as weather permits. Thank you to those residents who were affected by the initiative. Your patience and cooperation throughout the process is appreciated.
West Chestermere Drive
| Construction: | June 2012 – October 2012 |
This spring the Town of Chestermere will begin a construction project to upgrade West Chestermere Drive.
The plan is to address current drainage (flooding) issues along West Chestermere Drive and at the same time upgrade old and failing portions of the road. The project will address drainage within the entire road area including town property that runs alongside the existing roadway
Open House
Open House information sessions were held for the West Chestermere Drive ugrade on February 15th and May 16th, 2012.
Below are some of the posters presented at the Open House:
Overview
Construction
Driveways
Driveway and Landscape Options
Reminders for Residents
Timeline
Contact
For further information regarding this project, please contact:
Development Services Department
Town of Chestermere
105 Marina Road
Chestermere, AB
T1X 1V7
Phone: (403) 207-7075
Email:
=================================
Take a Walk Down Main Street – New Development Proposal
- The proposed Professional Building is an eye-catching two-storey building comprised of approximately 53,000 square feet of office and retail space. Keeping in line with the small town atmosphere that residents of Chestermere enjoy, this building will be oriented onto a pedestrian friendly Main Street. This Main Street will be complete with street furnishing and connections to John Peake Park, serving as a focal point for activity in Chestermere Town Centre.

- Click here to see the conceptual drawings (this is a large file, so it may take a few minutes to download): Proposed Professional Building Conceptual Drawings
- Please note that these drawings are conceptual and may be subject to changes. For development inquiries, please contact the Town of Chestermere Development Services Department at (403)207-7075. For business inquiries, please contact: Jarett Thompson at Melcor Developments (403)270-1297 email